Bristol Prime Contractors completed the equipment building for the new Aalax Landfill in November, 2025. It has a man door and a garage door, cedar siding, and a metal roof. They were also able to auger and prepare post holes for gate posts. They will return in the spring of 2026 to install the fencing, gate, and signs.
