RFP posted for Flood Mitigation Project

The City issued a request for proposals (RFP) for the Salt Lagoon and Community Pond Flood Mitigation project on May 1, 2026. To be considered, proposals must be received via email no later than 3:00 pm Alaska Daylight Saving Time on June 30, 2026. The City will review and score proposals and execute a contract with the selected firm by July 30, 2026.

The selected firm will provide 100% design drawings for three road hazard mitigation protection strategies, and 100% design for side slope stabilization and wave protection. The qualified firm will also perform an environmental review, NEPA, Section 106, Section 7, and all necessary permitting. The firm will address increasing coastal flooding, storm surge risks, and erosion through the development of new roadway designs integrating solutions to protect critical utility infrastructure and homes while enhancing wetland habitats critical for migrating birds.