Airport Feeder Update Sept. 29, 2026
The Airport Distribution Feeder replacement is scheduled to be completed by the end of 2026. Crews will return to the island in October to restart the construction that had been put on hold while the City worked to obtain the last of the funding from USDA RUS.
DOWL and City Kick-Off Work on Flood Mitigation Project
The City and the selected firm, DOWL, kicked off the project in early September. DOWL is preparing for a site visit in October to visit the locations, collect data and hold a public involvement and outreach sessions.
Bulk Fuel Facility Upgrade Project Moves Toward October Completion
Prism’s crew arrived on the island in June, and work began starting with the demolition and removal of the fencing, the existing fuel pumps and disconnecting the fuel and electrical lines. The welders arrived in July. Preparation for the new fuel tanks began mid-June and they were finished being installed on July 3rd along with […]
EPA Grants Officer Visits Aalax Landfill Site
The EPA Grants Officer made a site visit in August and was pleased with the work performed. He had no issues. The site work including grading has been finished. Contractors came on September 10th to install the gate and fencing, the bollards, and signs. Hydroseeding was applied on the exposed ground on the exterior of […]
Work Begins On Small Boat Harbor Utilities Project
Alaska Geothermal started work on the small boat harbor utilities on July 29th. They were able to move the Manitowoc crane that was blocking the area where the trench was going to be dug for the water and utility lines. At the beginning of August, the water pipes were placed in the trench and the […]
Wastewater Lift Station Project Update 9/29/26
The Contractor has been onsite in September working to complete the buildings. The door has been installed at the Ellerman and Sandy Lane Lift Stations. Conduit, heaters, and lights have been installed at the Sandy Lane Lift Station. Electrical equipment has been installed at Ellerman.